LB3980 Wireless Communication Channel Setting

Our Battery Load Units LB3980 communicate with its DAC ( if have DAC) via wireless WiFi, as all units use same wireless communication channel default, if you have two units with DAC work at the same place at the same time, it's rare happen, but if it's happen, you would need to switch the communication channel of some units in case the communication between main units and DAC intertwined

LB3980 Wireless Communication Channel Setting2021-11-03T00:35:39+00:00

LB3980 discharge voltage setting

The discharge voltage is set accordingly with the model of your battery load units, like LB48V-300A is set with discharge voltage 48V, normally all these have been set correctly and QC before delivery, customer no need to worry or do anything about it, in case you need to change or reset the discharge voltage somehow, the instruction bellow would be useful

LB3980 discharge voltage setting2021-11-03T00:35:39+00:00

LB3980 Ultraspeed Mode

Normally there is a period of time to allow our LB3980 work safely from beginning to full load, if you want to speed up this procedure, it is also possible

LB3980 Ultraspeed Mode2021-11-03T00:35:39+00:00

LB3980 MOSFET replace

Once MOSFET in LB3980 is damage, you have to replace it to enable LB3980 work normally again

LB3980 MOSFET replace2021-11-03T00:35:39+00:00

LB3980 Language Switch

Our battery Load units LB1980 currently have two language options, English and Chinese, the product send to oversea customers come in English default, if language switch is necessary, the instruction bellow can be useful

LB3980 Language Switch2021-11-03T00:35:39+00:00
Go to Top